Oct 22 – 27, 2023
Lahan Select Gyeongju, South Korea
Asia/Seoul timezone

Drift Observations and Mitigation in LCLS-II RF

Oct 23, 2023, 4:05 PM
20m
Oral or Poster System and operation System and operation

Speaker

Shreeharshini Dharanesh Murthy (Lawrence Berkeley National Laboratory)

Description

The LCLS-II RF system physically spans ~700m and has strict requirements -- on the order of 20 fs -- on the phase stability of the accelerating RF fields in its SRF linac.
While each LLRF rack is crudely temperature-stabilized, the weather inside the service building as a whole is usually compared to a tin shack in the California sun. A phase-averaging reference line is the primary system deployed in support of the phase stability goals. There are other, secondary subsystems (SEL phase offset, and determination of cavity detuning) that are also sensitive to RF phase drift.
We present measurements of phase shifts observed in the overall RF system, and how diagnostics are able to sense and correct for them during beam operations.

Keyword linac, drift

Primary authors

Andy Benwell (SLAC National Accelerator Laboratory) Bo Hong (SLAC National Accelerator Laboratory) Chengcheng Xu (SLAC National Accelerator Laboratory) Daron Chabot (SLAC National Accelerator Laboratory) Janice Nelson (SLAC National Accelerator Laboratory) Mr Jing Chen (SLAC National Accelerator Laboratory) Larry Doolittle (Lawrence Berkeley National Laboratory) Shreeharshini Dharanesh Murthy (Lawrence Berkeley National Laboratory) Sonya Hoobler (SLAC National Accelerator Laboratory)

Presentation materials