Nov 13 – 15, 2024
Hotel Lahan, Pohang, Korea
Asia/Seoul timezone

Implementation of the Control Systems for the 1.7 MV Tandem Accelerator and beamlines at KOMAC

Nov 14, 2024, 1:00 PM
1h 30m
2F Poster Hall

2F Poster Hall

Board: WG1-18
Poster ICABU WG1. Accelerator Systems ICABU Poster Session

Speaker

Jae-ha Kim (KOMAC/KAERI)

Description

KOMAC has been operating the 1.7 MV tandem accelerator, and has recently been improving the layout of the accelerator and beamline with the goal of establishing a PIXE system for cultural heritage analysis. Additionally, A distributed control system was implemented to enhance the stability of the control system, as replacing the previous centralized control system. The user interface has also been improved for operator convenience, and a beam characteristics analysis application has been developed to ensure precise analysis of the accelerator and beam characteristics. This paper will describe the implementation of the control system for the 1.7 MV tandem accelerator and various beamlines.

Contribution track ICABU WG1. Accelerator Systems

Primary author

Jae-ha Kim (KOMAC/KAERI)

Co-authors

Hyeok-Jung Kwon (Korea Atomic Energy Research Institute) Kye-Ryung KIM (KAERI) Sung-yun Cho (KOMAC/KAERI) Yong-Sub CHO (KAERI) Young-gi Song (KOMAC/KAERI)

Presentation materials

There are no materials yet.