Nov 13 – 15, 2024
Hotel Lahan, Pohang, Korea
Asia/Seoul timezone

Status of the RAON heavy ion accelerator

Nov 15, 2024, 10:00 AM
25m
5F Grand Hall

5F Grand Hall

Oral ICABU WG1. Accelerator Systems Facility Report Talk

Speaker

Dong-O Jeon (Institute for Basic Science)

Description

Status of the Ar8+ beam commissioning and user service of the RAON is presented. Beam tuning was done with Ar8+ beam and test of experiment systems such as KoBRA and NDPS were done. And Ar8+ beam was provided for users of the KoBRA. Na5+ rare isotope beam from the ISOL was accelerated by the superconducting linac and used to test the experiment system.

Contribution track ICABU WG1. Accelerator Systems
Paper submission Plan No
Best Presentation No

Primary authors

Dong-O Jeon (Institute for Basic Science) Hyung Jin Kim (Insititute for Basic Science) Ji-Ho Jang Yujung Ahn (IBS)

Presentation materials