Nov 13 – 15, 2024
Hotel Lahan, Pohang, Korea
Asia/Seoul timezone

Development Status of new 3-MeV RFQ for KOMAC

Nov 14, 2024, 1:00 PM
1h 30m
2F Poster Hall

2F Poster Hall

Board: WG1-33
Poster ICABU WG1. Accelerator Systems ICABU Poster Session

Speaker

Dr Han-Sung Kim (Korea Atomic Energy Research Institiute)

Description

A 3-MeV RFQ for KOMAC has been operated for almost 20 years and its performance has been degraded gradually in terms of arcing and beam transmission. We have designed new RFQ with some modifications to replace the current one. Main features of modifications include longer gentle buncher section, which results in better stability at high current. In addtion, we determined to remove resonant coupling plate located in the middle of the cavity and reduce the number of section from 4 to 3. Main parts of the RFQ are under fabrication and the final assembly by using vacuum brazing will be conducted in-house. The details of the development status of the new RFQ for KOMAC will be given in this presentation.

*This work has been supported through KOMAC operation fund by MSIT.

Contribution track ICABU WG1. Accelerator Systems
Paper submission Plan Yes
Best Presentation No

Primary author

Dr Han-Sung Kim (Korea Atomic Energy Research Institiute)

Co-author

Dr Hyeok-Jung Kwon (KAERI)

Presentation materials

There are no materials yet.