Nov 13 – 15, 2024
Hotel Lahan, Pohang, Korea
Asia/Seoul timezone

Operation Status of KOMAC Linac

Nov 13, 2024, 4:50 PM
25m
5F Grand Hall

5F Grand Hall

Oral ICABU WG1. Accelerator Systems Facility Report Talk

Speaker

Hyeok-Jung Kwon (Korea Atomic Energy Research Institute)

Description

100 MeV proton linear accelerator (linac) has been operating since 2013 at Korea Multi-purpose Accelerator Complex (KOMAC). Nowadays, 4 beam lines are routinely used to supply proton beam to users. In addition, neutron beam line starts user service after pilot operation. In this paper, the activities of the KOMAC linac for last few years and upgrade plan of the linac are discussed.

This work was supported through KOMAC operation fund of KAERI by the National Research Foundation of Korea (NRF) grant funded by the Korea government (MSIT) (KAERI-524320-24).

Contribution track ICABU WG1. Accelerator Systems
Paper submission Plan Yes
Best Presentation No

Primary author

Hyeok-Jung Kwon (Korea Atomic Energy Research Institute)

Presentation materials