Oct 22 – 27, 2023
Lahan Select Gyeongju, South Korea
Asia/Seoul timezone

LLRF hardware design in SHINE

Oct 25, 2023, 5:31 PM
4m
Oral or Poster Hardware Posters

Description

Shanghai HIgh repetition rate XFEL aNd Extreme light facility (SHINE) is 8GeV、CW mode FEL facility. The length of LINAC is 1.2km. The 5.2kW SSA will drive the 1.3GHz SC, In LINAC, there are single cavity cryomodule with two high power couplers, ABBA injector cryomodule, 75’s 1.3GHz standard cryomodules, two 3.9GHz harmonic cryomodule. The RF amplitude and phase requirement of one cryomodule are 0.01% and 0.01deg respectively. This presents will introduce SHINE status up to now and the LLRF hardware design.

Keyword SHINE LLRF Hardware

Primary authors

Mr Kai Xue (Shanghai advanced research institute. CAS) Mr Wenfeng Yang (Shanghai advanced research institute. CAS) Mr Xiang Zheng (Shanghai advanced research institute. CAS) Ms Xuefang Huang (Shanghai advanced research institute. CAS) Yubin Zhao (Shanghai advanced research institute. CAS) Mr Zhigang Zhang (Shanghai advanced research institute. CAS)

Presentation materials